Follow us

The following is required for performance of operation:

  • non-standard CT fleet; 
  • Frac fleet; 
  • Fracturing Engineering; 
  • Large-volume tanks;
  • Non-standard set of through tubing equipment for landing of plug and perforation; 
  • Composite plugs.